Optimal Placement of a Defined Number of Phasor Measurement Units in Power Systems
نویسنده:
, , , , ,سال
: 2012
چکیده: Abstract—Nowadays, in real power systems in most countries
around the world, common measurement units and SCADA
systems are used for data measurement and state estimation.
Some Electricity Companies have installed and applied Phasor
Measurement Units (PMUs) for system observability.
Nevertheless, number of Phasor Measurement Units might be
limited due to financial considerations and this limited number
may be used together with common measuring systems. Thus,
this paper provides a novel method for optimal placement of a
limited number of phasor measurement units. Two main problem
are discussed in this paper: one is placement of a limited number
of phasor measurement units in case the units are less than the
minimum number required for the system to be observable, and
the other is placement of phasor measurement units in case the
units are more than the minimum number required for the
system to be observable. The first scheme takes into account the
system observability in presence of Phasor Measurement Units,
minimizing state estimation error and considering future
supplementary plan, and also determining candidate buses for
installing PMUs in future. While, the second one, takes into
account maximizing measuring system reliability with an
increase in redundancy of these measurement units and also
determining candidate buses for installing PMUs in future. The
proposed method has been simulated and analyzed on the IEEE
standard 14 bus test system and the results show the efficiency of
the method.
around the world, common measurement units and SCADA
systems are used for data measurement and state estimation.
Some Electricity Companies have installed and applied Phasor
Measurement Units (PMUs) for system observability.
Nevertheless, number of Phasor Measurement Units might be
limited due to financial considerations and this limited number
may be used together with common measuring systems. Thus,
this paper provides a novel method for optimal placement of a
limited number of phasor measurement units. Two main problem
are discussed in this paper: one is placement of a limited number
of phasor measurement units in case the units are less than the
minimum number required for the system to be observable, and
the other is placement of phasor measurement units in case the
units are more than the minimum number required for the
system to be observable. The first scheme takes into account the
system observability in presence of Phasor Measurement Units,
minimizing state estimation error and considering future
supplementary plan, and also determining candidate buses for
installing PMUs in future. While, the second one, takes into
account maximizing measuring system reliability with an
increase in redundancy of these measurement units and also
determining candidate buses for installing PMUs in future. The
proposed method has been simulated and analyzed on the IEEE
standard 14 bus test system and the results show the efficiency of
the method.
کلیدواژه(گان): Placement,State Estimation,Observability,PMU,
SCADA
کالکشن
:
-
آمار بازدید
Optimal Placement of a Defined Number of Phasor Measurement Units in Power Systems
Show full item record
contributor author | عبدالرضا کرمی زاده | en |
contributor author | حبیب رجبی مشهدی | en |
contributor author | محمدابراهیم حاجی آبادی | en |
contributor author | abdolreza karami zadeh | fa |
contributor author | Habib Rajabi Mashhadi | fa |
contributor author | mohamad ebrahim hajiabadi | fa |
date accessioned | 2020-06-06T14:09:19Z | |
date available | 2020-06-06T14:09:19Z | |
date copyright | 5/23/2012 | |
date issued | 2012 | |
identifier uri | https://libsearch.um.ac.ir:443/fum/handle/fum/3384716 | |
description abstract | Abstract—Nowadays, in real power systems in most countries around the world, common measurement units and SCADA systems are used for data measurement and state estimation. Some Electricity Companies have installed and applied Phasor Measurement Units (PMUs) for system observability. Nevertheless, number of Phasor Measurement Units might be limited due to financial considerations and this limited number may be used together with common measuring systems. Thus, this paper provides a novel method for optimal placement of a limited number of phasor measurement units. Two main problem are discussed in this paper: one is placement of a limited number of phasor measurement units in case the units are less than the minimum number required for the system to be observable, and the other is placement of phasor measurement units in case the units are more than the minimum number required for the system to be observable. The first scheme takes into account the system observability in presence of Phasor Measurement Units, minimizing state estimation error and considering future supplementary plan, and also determining candidate buses for installing PMUs in future. While, the second one, takes into account maximizing measuring system reliability with an increase in redundancy of these measurement units and also determining candidate buses for installing PMUs in future. The proposed method has been simulated and analyzed on the IEEE standard 14 bus test system and the results show the efficiency of the method. | en |
language | English | |
title | Optimal Placement of a Defined Number of Phasor Measurement Units in Power Systems | en |
type | Conference Paper | |
contenttype | External Fulltext | |
subject keywords | Placement | en |
subject keywords | State Estimation | en |
subject keywords | Observability | en |
subject keywords | PMU | en |
subject keywords | SCADA | en |
identifier link | https://profdoc.um.ac.ir/paper-abstract-1033398.html | |
conference title | Second Iranian Conference on smart grid | en |
conference location | Tehran | fa |
identifier articleid | 1033398 |