•  English
    • Persian
    • English
  •   Login
  • Ferdowsi University of Mashhad
  • |
  • Information Center and Central Library
    • Persian
    • English
  • Home
  • Source Types
    • Journal Paper
    • Ebook
    • Conference Paper
    • Standard
    • Protocol
    • Thesis
  • Use Help
View Item 
  •   FUM Digital Library
  • Fum
  • Articles
  • ProfDoc
  • View Item
  •   FUM Digital Library
  • Fum
  • Articles
  • ProfDoc
  • View Item
  • All Fields
  • Title
  • Author
  • Year
  • Publisher
  • Subject
  • Publication Title
  • ISSN
  • DOI
  • ISBN
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Optimal Placement of a Defined Number of Phasor Measurement Units in Power Systems

Author:
عبدالرضا کرمی زاده
,
حبیب رجبی مشهدی
,
محمدابراهیم حاجی آبادی
,
abdolreza karami zadeh
,
Habib Rajabi Mashhadi
,
mohamad ebrahim hajiabadi
Year
: 2012
Abstract: Abstract—Nowadays, in real power systems in most countries

around the world, common measurement units and SCADA

systems are used for data measurement and state estimation.

Some Electricity Companies have installed and applied Phasor

Measurement Units (PMUs) for system observability.

Nevertheless, number of Phasor Measurement Units might be

limited due to financial considerations and this limited number

may be used together with common measuring systems. Thus,

this paper provides a novel method for optimal placement of a

limited number of phasor measurement units. Two main problem

are discussed in this paper: one is placement of a limited number

of phasor measurement units in case the units are less than the

minimum number required for the system to be observable, and

the other is placement of phasor measurement units in case the

units are more than the minimum number required for the

system to be observable. The first scheme takes into account the

system observability in presence of Phasor Measurement Units,

minimizing state estimation error and considering future

supplementary plan, and also determining candidate buses for

installing PMUs in future. While, the second one, takes into

account maximizing measuring system reliability with an

increase in redundancy of these measurement units and also

determining candidate buses for installing PMUs in future. The

proposed method has been simulated and analyzed on the IEEE

standard 14 bus test system and the results show the efficiency of

the method.
URI: https://libsearch.um.ac.ir:443/fum/handle/fum/3384716
Keyword(s): Placement,State Estimation,Observability,PMU,

SCADA
Collections :
  • ProfDoc
  • Show Full MetaData Hide Full MetaData
  • Statistics

    Optimal Placement of a Defined Number of Phasor Measurement Units in Power Systems

Show full item record

contributor authorعبدالرضا کرمی زادهen
contributor authorحبیب رجبی مشهدیen
contributor authorمحمدابراهیم حاجی آبادیen
contributor authorabdolreza karami zadehfa
contributor authorHabib Rajabi Mashhadifa
contributor authormohamad ebrahim hajiabadifa
date accessioned2020-06-06T14:09:19Z
date available2020-06-06T14:09:19Z
date copyright5/23/2012
date issued2012
identifier urihttps://libsearch.um.ac.ir:443/fum/handle/fum/3384716?locale-attribute=en
description abstractAbstract—Nowadays, in real power systems in most countries

around the world, common measurement units and SCADA

systems are used for data measurement and state estimation.

Some Electricity Companies have installed and applied Phasor

Measurement Units (PMUs) for system observability.

Nevertheless, number of Phasor Measurement Units might be

limited due to financial considerations and this limited number

may be used together with common measuring systems. Thus,

this paper provides a novel method for optimal placement of a

limited number of phasor measurement units. Two main problem

are discussed in this paper: one is placement of a limited number

of phasor measurement units in case the units are less than the

minimum number required for the system to be observable, and

the other is placement of phasor measurement units in case the

units are more than the minimum number required for the

system to be observable. The first scheme takes into account the

system observability in presence of Phasor Measurement Units,

minimizing state estimation error and considering future

supplementary plan, and also determining candidate buses for

installing PMUs in future. While, the second one, takes into

account maximizing measuring system reliability with an

increase in redundancy of these measurement units and also

determining candidate buses for installing PMUs in future. The

proposed method has been simulated and analyzed on the IEEE

standard 14 bus test system and the results show the efficiency of

the method.
en
languageEnglish
titleOptimal Placement of a Defined Number of Phasor Measurement Units in Power Systemsen
typeConference Paper
contenttypeExternal Fulltext
subject keywordsPlacementen
subject keywordsState Estimationen
subject keywordsObservabilityen
subject keywordsPMUen
subject keywords

SCADA
en
identifier linkhttps://profdoc.um.ac.ir/paper-abstract-1033398.html
conference titleSecond Iranian Conference on smart griden
conference locationTehranfa
identifier articleid1033398
  • About Us
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
DSpace software copyright © 2019-2022  DuraSpace