Search
Now showing items 1-6 of 6
Analysis Of Part Sequencing And Tool Replacement For An Automated Machining Center
This paper addresses a joint part sequencing and tool replacement problem on a machining center. The objective is to minimize the expected production cost subject to available tool spares. In literature, it has been shown that the sequencing...
Just-In-Time scheduling with tool replacement considerations
This paper addresses the combined JIT scheduling and tool replacement problem on a machining centre. The objective is to determine job sequence, tool spare requirement and corresponding replacement intervals so that the total expected processing...
Cutting Tool Reliability in Just-In-Time Production Decisions
In this paper, the effect of tool reliability and tool replacement on just-in-time (JIT) production
decisions was analyzed. It is proposed that the JIT planning decision be jointly made with the tool replacement decision on a machining centre...
using tabu-search algorithm for multi-objective planing in flexible manufacturing system
in this paper, a multi- objective model for simultaneous part sequencing and tool replacement schedule is presented and solved. the main objectives include determining optimal part sequence, tool assignment to machining process, tool replacement...
Simultaneous job scheduling and tool replacement based on tool reliability by proposed Tabu-SA algorithm
This paper addresses integrated job scheduling and tool replacement problems in a single machine environment with objectives to determine optimal job sequence, tool selection for operation, tool replacement schedule, and number of spares for each...
Solving The Combined part Sequencing And Tool Replacement Problem For an Automated Machining Center: a Tabu Search Approach
This paper addresses a joint part sequencing and tool replacement problem on an automated machining center. The objective is to minimize the expected production cost subject to available spare tools. In the literature, it has been shown...