چکیده: This paper addresses a joint part sequencing and tool replacement problem on a machining center. The objective is to minimize the expected production cost subject to available tool spares. In literature, it has been shown that the sequencing problems with sequence-dependent setups are equivalent to the `travelling salesman problem` (TSP) and thus are NP-complete. In the problem under consideration, the cost components associated with tool replacement and defective part cost may be different if their position relative to other parts in the sequence is changed. This, coupled with the sequence-dependent setups, precludes optimal solutions for any meaningful sized problems. To provide quick and reasonably good solutions, we propose a `nearest neighbor heuristic` (NNH). The efficiency of the NNH algorithm is demonstrated with an example problem. The effects of tool spare level on the expected production cost are also discussed.
کلیدواژه(گان): Tool Replacement,Automated Machining Center
کالکشن
:
-
آمار بازدید
Analysis Of Part Sequencing And Tool Replacement For An Automated Machining Center
Show full item record
contributor author | فرهاد کلاهان | en |
contributor author | M. Liang | en |
contributor author | Farhad Kolahan | fa |
date accessioned | 2020-06-06T13:58:10Z | |
date available | 2020-06-06T13:58:10Z | |
date copyright | 8/10/1994 | |
date issued | 1994 | |
identifier uri | http://libsearch.um.ac.ir:80/fum/handle/fum/3376883 | |
description abstract | This paper addresses a joint part sequencing and tool replacement problem on a machining center. The objective is to minimize the expected production cost subject to available tool spares. In literature, it has been shown that the sequencing problems with sequence-dependent setups are equivalent to the `travelling salesman problem` (TSP) and thus are NP-complete. In the problem under consideration, the cost components associated with tool replacement and defective part cost may be different if their position relative to other parts in the sequence is changed. This, coupled with the sequence-dependent setups, precludes optimal solutions for any meaningful sized problems. To provide quick and reasonably good solutions, we propose a `nearest neighbor heuristic` (NNH). The efficiency of the NNH algorithm is demonstrated with an example problem. The effects of tool spare level on the expected production cost are also discussed. | en |
language | English | |
title | Analysis Of Part Sequencing And Tool Replacement For An Automated Machining Center | en |
type | Conference Paper | |
contenttype | External Fulltext | |
subject keywords | Tool Replacement | en |
subject keywords | Automated Machining Center | en |
identifier link | https://profdoc.um.ac.ir/paper-abstract-1016781.html | |
conference title | Annual International Conference on Industry, Engineering and Management Systems-IEMS 94 | en |
identifier articleid | 1016781 |