Show simple item record

contributor authorAlireza Jalali Yazdien
contributor authorPerry Forsytheen
contributor authorAlireza Ahmadian Fard Finien
contributor authorمجتبی مغربیen
contributor authorAlireza Jalali Yazdifa
contributor authorPerry Forsythefa
contributor authorAlireza Ahmadian Fard Finifa
contributor authorMojtaba Maghrebifa
date accessioned2020-06-06T13:46:40Z
date available2020-06-06T13:46:40Z
date issued2019
identifier urihttps://libsearch.um.ac.ir:443/fum/handle/fum/3368633?locale-attribute=en&show=full
description abstractTimely delivery of materials and laborers to workface is critical to the smooth progression of a task on the construction site. This subject is of particular importance in high-rise building projects where the vertical transportation may turn into a bottleneck in the delivery process, if not precisely planned. In such contexts, lift cars represent a contested resource for movement of people and materials and any delayed lifting leads to disrupted tasks on the building floors. The available literature predominantly relies on predefined or rule-based scenarios in addressing the lifting problem which may result in suboptimal solutions to the operation of the lifts. Therefore, this research aims to develop a holistic mathematical model which identifies the optimum operational plan for the entire lift systems in high rise construction. The model has a mixed integer nature incorporating characteristics and constraints of lift cars, construction resources and activities, and site conditions. The optimality is targeted through minimum travel time both at the whole scale and for a single lift car. To improve generalizability, the model has been adapted to variant lift optimization problems under different construction scenarios. It is then integrated with the zoning problem in order to determine optimal zoning configuration for a given lift system. The model is tested on a hypothetical case replicating complexities and constraints of real-world situations. The results indicate that the model can efficiently find an optimal solution for the lift systems which imposes minimum vertical travel time to the project.en
languageEnglish
titleOptimization of flexible lift processes on high-rise building construction sitesen
typeJournal Paper
contenttypeExternal Fulltext
subject keywordsLift optimizationen
subject keywordshigh-rise constructionen
subject keywordsvertical transportationen
identifier doi10.1016/j.autcon.2019.102939
journal titleAutomation in Constructionfa
pages102939-102952
journal volume107
journal issue1
identifier linkhttps://profdoc.um.ac.ir/paper-abstract-1075759.html
identifier articleid1075759