Estimating the Change Point of a Normal Process Mean with a Monotonic Change
سال
: 2009
چکیده: One of the essential steps for process improvement is to quickly recognize the starting time or the change point of a process disturbance. In this paper, we describe the behavior model of process mean and then obtain a maximum-likelihood estimator (MLE) for the change point of the normal process mean without requiring the exact knowledge of the change type. Instead, we assume that the type of change present belongs to a family of monotonic changes. Finally, we study the performance of the proposed change-point estimator relative to the MLEs for the process mean change point derived under a simple step change and linear trend change assumption. We do this for a number of monotonic change types following a signal from a Shewhart X̄ control chart.
کلیدواژه(گان): statistical process control (SPC),change point,process improvement,maximum-likelihood estimator (MLE),monotonic change,isotonic regression
کالکشن
:
-
آمار بازدید
Estimating the Change Point of a Normal Process Mean with a Monotonic Change
Show full item record
contributor author | Rassoul Noorossana | en |
contributor author | علیرضا شادمان | en |
contributor author | Alireza Shadman | fa |
date accessioned | 2020-06-06T13:27:45Z | |
date available | 2020-06-06T13:27:45Z | |
date issued | 2009 | |
identifier uri | https://libsearch.um.ac.ir:443/fum/handle/fum/3355834 | |
description abstract | One of the essential steps for process improvement is to quickly recognize the starting time or the change point of a process disturbance. In this paper, we describe the behavior model of process mean and then obtain a maximum-likelihood estimator (MLE) for the change point of the normal process mean without requiring the exact knowledge of the change type. Instead, we assume that the type of change present belongs to a family of monotonic changes. Finally, we study the performance of the proposed change-point estimator relative to the MLEs for the process mean change point derived under a simple step change and linear trend change assumption. We do this for a number of monotonic change types following a signal from a Shewhart X̄ control chart. | en |
language | English | |
title | Estimating the Change Point of a Normal Process Mean with a Monotonic Change | en |
type | Journal Paper | |
contenttype | External Fulltext | |
subject keywords | statistical process control (SPC) | en |
subject keywords | change point | en |
subject keywords | process improvement | en |
subject keywords | maximum-likelihood estimator (MLE) | en |
subject keywords | monotonic change | en |
subject keywords | isotonic regression | en |
journal title | Quality and Reliability Engineering International | fa |
pages | 79-90 | |
journal volume | 25 | |
journal issue | 1 | |
identifier link | https://profdoc.um.ac.ir/paper-abstract-1054030.html | |
identifier articleid | 1054030 |