Search
Now showing items 1-10 of 21
Blocked two level semifoldover designs
Publisher: Elsevier Science
Year: 2014
A Fuzzy optimal planned replacement time based on availability and cost functions
Year: 2018
Abstract:
these parameters, we calculate
a fuzzy optimal planned replacement time based on cost and availability functions....
An optimal planned replacement time based on availability and cost functions for a system subject to three types of failures
Year: 2018
Abstract:
of this study is to find an optimal planned replacement time by taking into account all of the costs involved (repairs and replacements) and the availability of the system. It is interested in minimizing the total expected discounted cost and maximizing...
Enabling III–V integrated photonics with Er-doped Al<inf>2</inf>O<inf>3</inf> films
Publisher: IEEE
Year: 2014
Optimal shading coil cross-section for minimal ripple factor of AC electromagnet attracting force
Publisher: IEEE
Year: 2014
Miniaturized wide-band dielectric resonator antenna for ISM applications
Publisher: IEEE
Year: 2014
Optimal planning of static and dynamic reactive power resources
Publisher: IET
Year: 2014
Congestion management of a multi-bus transmission system using distributed smart wires
Publisher: IEEE
Year: 2014
Transmission-Capacity Expansion for Minimizing Blackout Probabilities
Publisher: IEEE
Year: 2014