Initial results of ship detection and tracking using WERA HF ocean radar with MIMO configuration
ناشر:
سال
: 2014شناسه الکترونیک: 10.1109/WSC.2014.7020014
کلیدواژه(گان): discrete event simulation,industrial training,personnel,production planning,ABS method,DES method,agent-based simulation method,cross-training method,discrete-event simulation,dynamic multiskilled workforce planning problem,human resource,hybrid simulation approach,production line,productivity,worker forgetting ffect,worker learning effect,worker pool size,workforce flexibility,workload variation,Maintenance engineering,Manufacturing systems,Mathematical model,Planning,Pro
کالکشن
:
-
آمار بازدید
Initial results of ship detection and tracking using WERA HF ocean radar with MIMO configuration
Show full item record
| date accessioned | 2020-03-12T20:25:08Z | |
| date available | 2020-03-12T20:25:08Z | |
| date issued | 2014 | |
| identifier other | 6869265.pdf | |
| identifier uri | https://libsearch.um.ac.ir:443/fum/handle/fum/1013817 | |
| format | general | |
| language | English | |
| publisher | IEEE | |
| title | Initial results of ship detection and tracking using WERA HF ocean radar with MIMO configuration | |
| type | Conference Paper | |
| contenttype | Metadata Only | |
| identifier padid | 8137002 | |
| subject keywords | discrete event simulation | |
| subject keywords | industrial training | |
| subject keywords | personnel | |
| subject keywords | production planning | |
| subject keywords | ABS method | |
| subject keywords | DES method | |
| subject keywords | agent-based simulation method | |
| subject keywords | cross-training method | |
| subject keywords | discrete-event simulation | |
| subject keywords | dynamic multiskilled workforce planning problem | |
| subject keywords | human resource | |
| subject keywords | hybrid simulation approach | |
| subject keywords | production line | |
| subject keywords | productivity | |
| subject keywords | worker forgetting ffect | |
| subject keywords | worker learning effect | |
| subject keywords | worker pool size | |
| subject keywords | workforce flexibility | |
| subject keywords | workload variation | |
| subject keywords | Maintenance engineering | |
| subject keywords | Manufacturing systems | |
| subject keywords | Mathematical model | |
| subject keywords | Planning | |
| subject keywords | Pro | |
| identifier doi | 10.1109/WSC.2014.7020014 | |
| journal title | adar Symposium (IRS), 2014 15th International | |
| filesize | 283383 | |
| citations | 0 | |
| contributor rawauthor | Dzvonkovskaya, A. , Helzel, T. , Petersen, L. , Merz, C.R. , Liu, Y. , Weisberg, R.H. |


