Search
Now showing items 1-10 of 28
Effect of Monitoring and Self-checking Tests Effectiveness Index of Back-Up Protection System on the Optimum Routine and Self-checking Test Intervals of Protection System
Year: 2011
Abstract:
In order to maximize the availability of protection system and minimize the risk of mal-operation, usually protective
relay test carry out in power electrical industry. Determination of precise optimum routine test ...
Maximum Lightning Overvoltage Location and Reliability Indices in Power System with Combined Transmission Line
Year: 2010
Abstract:
Maximum Lightning Overvoltage Location and Reliability Indices in Power System with Combined Transmission Line