•  English
    • Persian
    • English
  •   Login
  • Ferdowsi University of Mashhad
  • |
  • Information Center and Central Library
    • Persian
    • English
  • Home
  • Source Types
    • Journal Paper
    • Ebook
    • Conference Paper
    • Standard
    • Protocol
    • Thesis
  • Use Help
Search 
  •   FUM Digital Library
  • Search
  •   FUM Digital Library
  • Search
  • All Fields
  • Title
  • Author
  • Year
  • Publisher
  • Subject
  • Publication Title
  • ISSN
  • DOI
  • ISBN
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Search

Show Advanced FiltersHide Advanced Filters

Filters

Use filters to refine the search results.

Now showing items 1-10 of 116

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Preparation and characterisation of lithium ion exchange composite for the recovery of lithium from brine 

    Type: Journal Paper
    Author : Saeid Zandvakili; Mohammad Ranjbar
    Year: 2017
    Request PDF

    A generalized variable neighborhood search algorithm for the talent scheduling problem 

    Type: Journal Paper
    Author : Mohammad Ranjbar; Ahmad Kazemi
    Year: 2018
    Request PDF

    An Optimal NPV Project Scheduling with Fixed Work Content and Payment on Milestones 

    Type: Journal Paper
    Author : محمد رنجبر; Mohammad Ranjbar
    Year: 2011
    Abstract:

    We consider a project scheduling problem with permitted tardiness and discrete time/resource trade-offs under maximum net present value objective. In this problem, a project consists of a set of sequential phases such that ...

    Solving the resource-constrained project scheduling problem using filter-and-fan approach 

    Type: Journal Paper
    Author : محمد رنجبر; Mohammad Ranjbar
    Year: 2008
    Abstract:

    The resource-constrained project scheduling problem is a notoriously difficult problem in combinatorial optimization for which extensive investigation has been devoted to the development of efficient algorithms to find ...

    Solving the resource availability cost problem in project scheduling by path relinking and genetic algorithm 

    Type: Journal Paper
    Author : محمد رنجبر; Mohammad Ranjbar
    Year: 2008
    Abstract:

    This paper considers a project scheduling problem with the objective of minimizing resource availability costs required to execute the activities in a project by a given project deadline. The project contains activities ...

    Solving the discrete time/resource trade-off problem in project scheduling with genetic algorithms 

    Type: Journal Paper
    Author : محمد رنجبر; Mohammad Ranjbar
    Year: 2007
    Abstract:

    In this paper, we develop a metaheuristic procedure for solving the discrete time/resource trade-off problem in the field of project scheduling. In this problem, a project contains activities interrelated by finish-start-type ...

    One-by-one or altogether: The advantages of pursuing alternative innovation activities 

    Type: Conference Paper
    Author : محمد رنجبر; Mohammad Ranjbar
    Year: 2012
    Abstract:

    A fundamental challenge associated with research or new product development projects is identifying that innovative activity that will deliver success. In such projects, it is typically the case that innovative breakthroughs ...

    A branch-and-bound algorithm for scheduling of new product development projects 

    Type: Journal Paper
    Author : محمد رنجبر; Mohammad Ranjbar
    Year: 2013
    Abstract:

    In this paper, we consider a scheduling problem in a new product development

    project. Each research and development project consists of a set of activities in

    which each activity may be executed by several ...

    A path-relinking metaheuristic for the resource leveling problem 

    Type: Journal Paper
    Author : محمد رنجبر; Mohammad Ranjbar
    Year: 2013
    Abstract:

    This paper deals with project scheduling problem with resource leveling objective function where precedence relations among activities are prescribed. We develop a dedicated path-relinking metaheuristic algorithm to tackle ...

    A Hybrid GRASP Algorithm for Minimizing Total Weighted Resource Tardiness Penalty Costs in Scheduling of Project Networks 

    Type: Journal Paper
    Author : محمد رنجبر; Mohammad Ranjbar
    Year: 2012
    Abstract:

    In this paper, we consider scheduling of project networks under minimization of total weighted resource tardiness penalty costs. In this problem, we assume constrained resources are renewable and limited to very costly ...

    • 1
    • 2
    • 3
    • 4
    • . . .
    • 12

    Author

    ... View More

    Publisher

    Year

    Keywords

    ... View More

    Type

    Language (ISO)

    Content Type

    Publication Title

    ... View More
    • About Us
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    DSpace software copyright © 2019-2022  DuraSpace